- Phelan Green has contracted Honeywell Technologies to supply Advanced Solvent Carbon Capture (ASCC) technology and modular engineering services for the first phase of its eSAF facility in Saldanha Bay, South Africa.
- Following a recent FID on Phase 1 and an earlier selection of Honeywell UOP’s Fischer-Tropsch (FT) Unicracking process, the integrated modular package utilizes end-to-end solutions to streamline execution and lower technical integration risks.
- Scaled to produce up to 140,000 metric tons of eSAF annually, the Saldanha Bay plant forms a central component of the broader $2.5 billion Phelan Green Hydrogen Project.
Clean energy developer Phelan Green, operating through its synthetic fuels subsidiary Phelan eFuels, has awarded a contract to Honeywell Technologies to license its Advanced Solvent Carbon Capture (ASCC) technology and provide modular engineering services for the initial phase of its electro-sustainable aviation fuel (eSAF) complex in Saldanha Bay, South Africa.
Announced on November 18, 2026, the agreement builds upon Phelan Green’s recent Final Investment Decision (FID) for Phase 1, reached in September 2026, as well as an earlier decision to deploy Honeywell Technologies UOP’s Fischer-Tropsch (FT) Unicracking process technology at the site.
By consolidating carbon capture, synthesis gas generation, fuel synthesis, and final hydrocracking under a unified modular engineering framework, the deployment is designed to reduce multi-vendor integration risks and compress construction schedules.
End-to-End Synthesis Architecture and Strategic Hydrogen Integration
The Saldanha Bay facility pairs captured biogenic carbon dioxide with electrolytic green hydrogen to synthesize drop-in aviation fuel compliant with international jet fuel specifications.
Within the integrated process train, captured CO2 and renewable hydrogen are converted into synthesis gas via HyCOgen reverse water-gas shift technology before undergoing Fischer-Tropsch synthesis (FT-CANS) and final upgrading via UOP FT Unicracking to yield synthetic paraffinic kerosene.
Across three planned expansion phases starting with a 35,000-ton-per-year Phase 1 unit before scaling through 35,000-ton Phase 2 and 70,000-ton Phase 3 additions, the complex is engineered to reach a total production capacity of 140,000 metric tons per annum (MTPA).
Relevant: SkyKraft Secures $24.4M To Advance Swedish eSAF Project
Phelan Green Group Managing Director Blair Phelan noted that combining proven capture and synthesis technologies under a modular delivery model provides a coordinated, bankable pathway to establish South Africa as a competitive global exporter of lower-carbon aviation fuels.
Honeywell Technologies UOP President Rajesh Gattupalli added that integrated, connected process packages, which already underpin approximately 30% of global SAF production,are critical to lowering capital costs and building investor confidence for commercial-scale synthetic fuel developments.
The Saldanha Bay eSAF facility is anchored within the wider Phelan Green Hydrogen Project, a planned $2.5 billion private-sector energy development supported by dedicated wind, solar, and battery storage infrastructure. The initiative has received formal recognition from the South African government as a flagship trailblazer project within its nationally strategic Green Hydrogen program.
Read more: COP31: Ukraine And South Africa On The Carbon Capture Frontier
Source: carbonherald.com



